Wrong Answer. Try Again!

B is the correct answer. along with. To make sure management controls are effective in the long term, they must be designed from a base of solid hazard analysis and sustained by a supportive safety culture. They then must be accompanied by adequate resources, training, supervision, and appropriate consequences. Remember, management controls should be used in conjunction with, and not as a substitute for, more effective or reliable engineering controls. Now let's look at some examples of some management controls.

MODULE ONE: BASIC CONCEPTS

Practice Question 42

Select the Best Answer

Management controls should be used ___________________ engineering controls:

 

A. before

B. along with

C. instead of

D. in the absence of

 

 

 

 

 